What product(s) does your facility manufacture?
|
|
What is the age of your facility?
|
|
What is the square footage?
|
|
How many employees do you have?
|
|
How many maintenance or electrical employees do you have that work on energized electrical components?
|
|
Can data be collected during normal working hours?
|
|
Will you provide an electrician or someone familiar with your electrical system to accompany the data collector to assist in tracing circuits and identifying loads?
|
|
Will you provide a man lift or scissor lift with an operator to access overhead busways, if needed?
|
|
Do you have a one-line or riser diagram of your facility that can be furnished in a “.pdf” format?
|
|
Which utility provides service to your facility?
|
|
How many services come in from the electric utility?
|
|
∟At what voltage?
|
|
How does the main incoming service, from the utility, enter your facility?
|
|
What is the current rating of this service entrance equipment in amps?
|
|
What is the main breaker (main fuse) manufacturer, type, and size for this service entrance?
|
|
What is the KVA of each Utility Transformer?
|
|
If the facility has their own transformers > 125KVA, how many do you have?
|
|
∟What is the KVA of each?
|
|
What percent of your electrical distribution panels, breakers, etc are accurately labeled as to what they feed?
|
|
Does the facility have any equipment operating at voltages above 480V, such as compressors, circuit breakers, fuses, etc.?
|
|
∟If so explain. If possible quantify in terms of HP or KVA:
|
|
How many MCCs (motor control centers) does the facility have?
|
|
∟Approximate number of buckets total in all MCCs?
|
|
How many overhead busways does the facility have?
|
|
∟Estimated number of drops/bussplugs?
|
|
Estimate the number of 3-Phase panel boards in the facility:
|
|
Does the facility have any generators on-site for co-generation or power back-up?
|
|
∟If so, how many and what size?
|
|
What percentage of your facility has exposed ceilings?
|
|
What percentage of your facility has drop ceilings?
|
|
Does your facility have any large panels that require two people to open?
|
|
Comments/Questions
|
| |